This project includes the installation of approximately 646 LF of 18” RCP drainage pipe, ,22 LF of 18” HDPE drainage pipe, eight (8) FDOT Type C Inlets, 81 LF 10” HDPE Reuse line with transitions, 120 LF 6” HDPE Water line and four (4) 6” insert a valves. Asphalt will be removed and replaced during construction. Clearing and grubbing will be required for the installation of the drainage piping and structures. The Contractor shall provide all materials, equipment and labor to complete the project.
A mandatory pre bid meeting will be held at 2:00 p.m. (CST) on July 15, 2016 at the City of Panama City Beach City Hall Annex, 104 South Arnold Road, Panama City Beach, Florida.
Bids will be received until 2:30 p.m. (CST) on July 27, 2016 at the City of Panama City Beach City Hall Annex, 110 South Arnold Road, Panama City Beach, Florida and will be opened and publicly read immediately thereafter. All Bids shall be submitted in a sealed envelope clearly marked: “Sealed Bid: Panama City Beach – Caladium Circle – Drainage Improvements.”