City of Panama City Beach, FL
Home MenuEngineering
ABOUT US
The role of Engineering is to provide technical and logistical support to all City departments and enterprises. Work includes performing or contracting for services such as surveying, engineering design, construction inspection, and project administration (including contract and grant management services). Engineering’s primary objective is to upgrade existing public infrastructure, provide new infrastructure improvements consisting of transportation, stormwater, multi-use trail systems, and to regulate development of similar facilities in private ownership projects through an extensive plan review and inspection process. Engineering also strives to maximize right-of-way construction compliance with the City Codes and assist other departments and the public in properly addressing local, state, and federal requirements relating to most types of development.
PROJECT SUBMITTAL REQUIREMENTS
Plans for the Public Works Engineering Department must be separated with each department bound together by a rubber band: i.e. Utility Department Plans & all required paperwork bound together, Public Works Department Stormwater Plans & all required paperwork bound together.
Stormwater submittals must include the following:
Commercial/Residential Site/Stormwater Management/Drainage Information Completeness Check List
Stormwater Drainage Calculations - 2 copies (for projects within City limits)
Initial Set of Plans - A minimum of three (3) full-size (24" x 36" or 22" x 34" ) sets of complete signed and sealed engineered Plans. CD/DVD or flash drive with complete stormwater report and model data in ICPR (pdf, icpr)Project Re-submittal requires three (3) sets of plans
Project Specific Permits - During Engineering Plan review, Engineering Division will advise Project Engineer of other letter (s) of permission or permits from adjacent property owners and/or other public agencies (FDOT, FEMA, etc.) are required. Such documents include cross-access/drainage easements, FEMA CLOMR and LOMR, and FDOT access and crossing permits. Determination will be made at initial review if project will be required to be incorporated into the City's Stormwater Model for analysis prior to Final Approval.
ADDITIONAL INFORMATION
To view a form or a document, please click on the name:
- PLAN REVIEW FEES
- INVOICE FOR PLAT AND SUBDIVISION FEES
- NPDES AS-BUILTS CERTIFICATION
- STORMWATER AS-BUILTS CERTIFICATION
- COMMERCIAL FINAL ACCEPTANCE CHECKLIST
- MINIMUM TECHNICAL STANDARDS CHECKLIST FOR AS-BUILTS
- CONTRACT CHANGE ORDER FORM
- FINAL PAYMENT AFFIDAVIT
- PLAT CHECK IN CHECKLISTS
- PLAT CHECKLISTS
- SUBDIVISION CHECK-IN CHECKLISTS
- SUBDIVISION CHECKLISTS
- COMMERCIAL/RESIDENTIAL STORMWATER MANAGEMENT/DRAINAGE INFORMATION COMPLETENESS CHECKLIST
- VARIANCE REQUEST FORM
ENGINEERING STAFF CONTACT INFORMATION:
Phone: (850) 233-5100, ext. 2524
Fax: (850) 233-5116