July of 2022 the City hired Volkert, Inc. to complete design plans to reduce localized flooding along Randy Road. The scope of services were to include: evaluation of existing conditions, design of proposed conditions, project management, permitting, surveying, cost estimates, bid specifications, and final construction plans. The final design is anticipated to be completed FY 2023 and construction in FY 2024.

 