City of Panama City Beach, FL
Home MenuResurfacing Projects
Resurfacing
Every year the Public Works Department is tasked with resurfacing roadways within City limits that are in need of repair or showing deterioration from normal traffic wear. Contracts are awarded to private companies in the late fall and winter for the following year.
With a limited amount of funding, roads in need of treatment must be prioritized. The appropriate treatment must be selected in order to stretch the funding we have to address the maximum amount of roads possible.
To help accomplish this task, Geotechnical Engineers rates pavement conditions every year throughout the city. These conditions are analyzed to determine the best type of treatment to extend the life of each pavement.
Treatments are chosen based on a variety of factors, including the current pavement condition, the ride quality, and the volume of traffic a road carries.
While a road may not look deficient to the casual observer, samples of the roadway under testing can reveal distresses that are concerning to Geotechnical Engineers.
The following roads were selected for repair this FY 2023:
(This is a proposed list. Some may be cut and placed on FY 2024 list due to budget constraints.)
Proposed Streets Wall Map_Street Resurfacing
- Sundial Street (from Front Beach Rd to northern limit)
- Suntime Street (from Twilight Bay Drive to cul-de-sac)
- Escanaba Avenue (from PCB Pkwy to SR 79)
- Half Acre Lane (from PCB Pkwy to Escanaba Avenue)
- Santo Thomas Drive (from PCB Pkwy to Hernando Avenue)
- N. El Centro Blvd (from PCB Pkwy to El Centro Blvd East)
- San Gabriel Street (from Castile Avenue to El Centro Blvd East)
- Sky Avenue (from western intersection with Lullwater Drive East to eastern limit)
- Habanero Avenue (from Lullwater Drive East to eastern limits)
- Oleander Court (from Gulf Blvd East to cul-de-sac)
- Poinsettia Drive (from Palm Avenue to Gulf Blvd East)
- Poinsettia Court (from Poinsettia Drive to cul-de-sac)
- Hibiscus Avenue (from Oleander Circle to Gulf Blvd East)
- Fairway Circle Extension (roadway connecting Nautilus Street to Colony Club)
- Sunset Circle (from Twilight Bay Drive to cul-de-sac)
- Colony Bay Harbour Drive (from Colony Harbour Road to Shadow Bay Drive)
- Colony Harbour Road (from Moonlight Bay Drive to Shadow Bay Drive)
- Shadow Bay Drive (from Moonlight Bay Drive to Colony Harbour Road)
- Gardenia Street (from PCB Pkwy to Hutchinson Blvd)
- Fernwood Street (from Agave Street to Hutchinson Blvd)
- Lynn Street (from Vestavia Street to Sands Street)
- Cathy Place (from Lynn Street to southern limit)
- Sands Street (from Front Beach Road to northern limit)
- Ashley Drive (from PCB Pkwy to eastern cul-de-sac)
- Caribbean Way (from Front Beach Road to Summer Breeze Road)
- Manistee Drive (from PCB Pkwy to Burnham Avenue)
- Castile Avenue (from Santo Thomas Street to Habanero Avenue)
- Castile Circle (from Castile Avenue to Lullwater Drive East)
- Lakeside Circle (from Lullwater Drive to Castile Avenue)
- Villa Court (from Castile Avenue to cul-de-sac)
- Woodtrail Drive (from Summerwood Drive to Summerwood Drive)
- Windridge Lane (from north to south cul-de-sacs, located off of Woodtrail Drive)
- Sandalwood Lane (intersection of Woodtrail Drive and Sandalwood Lane)
- Loblolly Court (from Summerwood Drive to cul-de-sac)
- Petunia Street (from San Vincente Street to Santo Thomas Street)
- Evergreen Street (from PCB Pkwy to Agave Street)
- Dogwood Street (from Hibiscus Street to Hutchinson Blvd)
- Edna Street (from Beth Street to Fernwood Place)
- Fernwood Place (from Edna Street to cul-de-sac)